Blast Room Installation

Blast Room installation at Doughty Steel, Delta, Co

Doughty Steel purchased a 12’ x 12’ x 20’ long Clemco 12’ sweep in trough blast room from M.C. Finishing in the first quarter of 2017. Doughty Steel/Mountain off Road division brought powder coating and blasting into their many capabilities which include welding, fabricating, machining, and laser cutting, to name a few.

Attached is installation pictures taken by M.C. Finishing. Install works well with 3 people. We estimated mechanical install (not counting ducting, electrical, or lights)

Took approx. 125 total man-hours. Doughty Steel rents cranes, so the dust collector assembly and install was a breeze.

INSTALLATION

Walls   lights   collector

Walls, Ceiling, and Door                       lights Dust                                          Collector

Scott and Cory at Doughty steel spearheaded the purchase and installation. They were very professional and pleasant to work with.

scott

Scott after blasting his first part

Doughty Steel has great family owner ship, management, and employees.

If your looking for a company to handle your manufacturing sub-contracting in the Colorado area, they have our recommendation.

Leave a Reply

Your email address will not be published.